Saturday, May 28, 2011

Something Under Our Feet

Our tile is in and finished: the mudroom floor, the wall around the tub, and the bathroom floor.

Mudroom tile- It's called "Ayers Rock Cobalto Blue", which I find funny. I've been to Ayers Rock (yes, I did just work that in) and nothing about it reminds me of this tile, nor do I think that the tile or Ayers Rock have much to do with "blue". Maybe that's why we got a sweet discount on it.

Upstairs bathroom: "Stoney Point Grigio" on the floor and white subway tile around the tub.

The floor in the rest of the house was scheduled to be installed Monday, but now that's pushed back until Wednesday. Why? It's complicated. It involves stair guys, floor guys, us, "experts" on the phone in Georgia and the whole-like. What it comes down to is that our people here have been doing things a certain way for thirty years and if we throw them even the smallest design curve ball they balk and spend their time and energy trying to get us to change our minds rather than spending their time and energy embracing the new challenge (even if we're trying to get them to do something that's actually pictured in their own catalog). You would also think stair guys and floor guys had worked with each other before. This does not seem to be the case. This is difficult for Anthony and I to deal with, and I think it's because we both work in professions where learning something new (and collaborating) is celebrated.

So I'm holding my breath until Wednesday now.
-J