Six

The railings were added to the front porch last week, along with a temporary step.
We're hoping to be able to get in without having to do the front grading and landscaping right away.
That's on the docket for later in the summer.


Plywood cut, numbered and ready to cover all of our windows if a big storm should hit .
This is a requirement.
Anthony grumbled a bit about giving up this much space for these.

The house was inspected on Tuesday and six things were found to need additional attention. They were things like the height of a railing, an issue with the dryer vent, the thermostats not working, insulation plans that were needed, and the level of grading leading tothe front step. (I know that's only five- I can't remember the last one off the top of my head.)

So six things between us and an occupancy permit.

Add to that our growing punch list of little things we would like to have happen before we move in.

We have deliberately been staying away during working hours so that we aren't in anybody's way. It would all be fine if we would see some solid steady action during the day. I'm sure then all the "to-do's" could be "dones", but the action has been limited and sporadic.


One of my evening tasks this week- painting.

On another note- we are in need of an Energy Star refrigerator- if anyone has one they're not using. We would be happy to trade it for our non-energy-star-but-clean-and-works-fine fridge!
-J

Monday, May 30, 2011

The Night Job

Oceanographer by day, amateur homebuilder by night, and enough grace and stamina leftover to take a time-out and care for Natalie when she pulls her first fever (no worries- she's better now). The glow next door reflects the many nights spent working next door (and highlights the need for shades/curtains).


Sometime in the middle of the night

On Thursday most of our light fixtures were installed by the electricians. Apparently we had lost count of how many lights we actually had, as we ended up being short three fixtures...the master bedroom closet, the washer/dryer area, and the mudroom (after all the problems it's caused us, we just forgot all about it). A few others, like the ones over the island, were deferred until the island was actually secured in place with a countertop. Still, it was fun to see some of the rooms take shape with the trim work nearly complete and the lights up...some of the lights even have temporary bulbs.


Anthony and Natalie checking out the sconce in the bathroom.

We are striving for a Energy Star HERS rating that will require at least 80% of the lights to be something other than incandescent. As most electricians and 'lighting experts' abhor CF or similar energy efficient bulbs because of their un-incandescentness, most of our bulbs will be supplied by a energy rating company (the same people who will pressure test our whole house), and are yet to come in. So the electricians left a skeleton crew of bulbs in place, perhaps to show us that they all actually worked. Again, much of the house, really just the simple rooms, feels like it is almost there...and just waiting for the floor.

These little button lights are our go-to easy fix for many areas of the house.

Which brings me to the rest of the weekend - after another trip to our Swedish hardware/furniture/solution store - we came home with the three remaining lights as well as our temporary solution to a kitchen countertop. Sunday, Anthony finished putting together and securing the cabinets and placed the temporary countertop. There is still one piece of the temporary top that we'll have to pick up, but it was on back order until this coming week. We're using temporary tops in the kitchen and bathrooms so that we can complete the project enough to move in and then focus on making the real ones at our leisure.


Island with butcher block top

We also finalized our door hardware on Friday, which took a dramatic switcheroo right at the end. Many of our selection 'issues' seem to occur when we have some entrenched design preference or idea or concept fixed in our heads that, over time, becomes untenable. Of course once you've decided to go a certain direction, it takes so much longer and so much more effort to change to a direction you'd previously discounted for some, previously iron-clad reason. (Perhaps this is what our builder was going through with our stairs). We were originally heading in one direction with cool handlesets and deadbolts and fancy rectangular rosettes from Emtek, when it occurred to us we wouldn't be able to leave and lock our doors without a key (which in hindsight, everyone should be able to do). After a too-long struggle to find a workable option with Emtek, we ended up changing lock and lever style as well as manufacturers completely. Writing this, it sounds like trivial issue, which I totally agree with, but for 'frugal wafflers' this is a bad scene.

Finally, it's felt like we've been hemorrhaging monopoly money for the past few months, but we think we now have everything ordered, planned out, or waiting to be installed. Everything, that is, except the kitchen sink. We'll have to get on that.
-J

Saturday, May 21, 2011

Anthony the Scandinavian Carpenter

Cost-saving measures require that we acquire new personas. Ikea requires that we find some freetime in the middle of the night for a few weeks and can understand diagrams with little quizzical cartoon guys.

Anthony has been putting cabinets together whenever he has a "bit" of time since we picked them up flatpacked back in April. Last weekend we also started to install them so that they'll be in place before the floor goes in. There was some initial worry about making sure we were certain where the studs and a pipe were hidden, but the purchase of a stud finder confirmed our measurements and we were set to drill into our new walls and start hanging.

Cabinet One (note the daylight)

Two

Three

Four... right side uppers all hung (while the rest of the world sleeps)

Of course, even with all the planning and measuring and wall moving, Anthony discovered that the architect had not accounted for picky little things like the width of the window trim, or at least the window trim that the builder had put on, and so we had to rethink how we were going to handle our new odd-sized space on the left side of the window. I think we've figured out a new plan that should work. We shall see as the installation continues...
-J

Friday, May 20, 2011

Shim the Trim, Paint the Shelf

The past week or so, John's workers have been busy finishing up the trim around the window, doors, and closets. Painters have been appearing randomly to prime the trim that is done, and returning again later to prime others. I think it is safe to say that we are starting to get close to the end...of what seems like the long, twisty path to completion. It's been interesting to see each of our decisions come to fruition.

Basement trim completed. We love the shelves that resulted from our thick walls.

Along the way we have turned to various people for advice. Sometimes it just happens to be an innocent friend/family member/acquaintance/random person on the street who was unfortunate to offer us a polite, "hey, how's your house coming along?" and sometimes it's people we actively seek out in the middle of decision-making panic attacks. I guess we figure that if we follow their advice and don't like it we can blame someone besides ourselves. However, in other cases we have to give credit where credit is due.

Windows at the top of the stairwell

Jamey got the window trim phone call late one night. He has art degrees and Urban Outfitters cred so we figured he knew what he was doing. His design input was to look at white like the matte of a framed picture. Now that the white (which is way cheaper) trim is in we can really see what he means. Especially when that "picture" is of the pond or the trees. Bright, clean, pretty...

Living room windows

There are other parts of the house that have turned out surprisingly nice, especially those that we didn't really think about ahead of time. Along the edges of the thick basement walls, we let the sash of the window extend and create a shelf. For many of these items, it's been a struggle to get our builder to find the joy in doing something creative and unique, so when we end up with something like this it's extra exciting.

Checking out the view from the room in the basement

In addition to the trim, the carpenter has been busy installing shelves and rods in the closets and pantry. We had to peer into the crystal ball of our future lives and try to figure out what belongings we were going to put where and what the arrangement of shelves and rods should be. We won't really know how we did on that until we move back in.

Upstairs linen closet with shelves

I guess if it doesn't all fit we can always store our extra stuff in my parents' barn or my in-laws' basement (just trying to see who's reading all the way to the end...).
-J

Saturday, April 9, 2011

At Least I hope It's the Drywallers

7:00 this morning I watched the workers pull up and climb through the window to start work. One guy was armed with a 2-liter of Mountain Dew and a Red Bull, so I expect the job to go quickly. Zippy's extra anxious because they also brought a little dog with them today.
- J

Monday, February 28, 2011

The New View

Here's a preview of our new view out the back of the middle floor to the pond...

- A

Friday, February 25, 2011

Someday We'll Watch Storms From the Porch

But today we'll stay inside and be thankful the the roof is on the house. This is being typed at the end of a long windy, rainy day. But we'll show what happened before that.

Day three of the porch saw the addition of our little triangle that makes a normal shed roof into a little something else. As with all the design ideas that will (or are supposed to) add charm to our house, Jody has laid claim to the triangle concept. Triangles must be harder than rectangles though, because it took a whole day and a lot of measuring to put on that piece of charm yesterday. Apparently the stairs are still my idea...meaning that the jury is still out. If only we could figure out where to put the lightswitches for them...

The outline of the porch roof triangle, and perhaps an afternoon nap?
We had a few days of nice weather, and they alternated between framing the inside, and continuing to finish the exterior. The windows are all in, and with the porch on, only the siding and doors will alter the view from the exterior.

Hopefully the siding will made the house look less like a can of Coors.
However, wind and rain came with vengeance today, actually blowing some of the rigid foam, not yet fully secured, around and off the house. Work continued inside as well as under the roof of the porch. We've picked a bead-board ceiling for the porch, which went in today. Jody has suggested that we go ahead and buy the porch swing now on the off chance that they'll install it for us as well.

Porch Ceiling
Despite the rain, the brain trust met today in the basement to discuss plumbing. With joists running the opposite direction that the drains have to go and few interior walls on the main floor, our plumber went through a number of plans before we settled on one that might work best. Although I've gotten the impression that "better" might just mean "easier for him".

We'll have to see...

The basement bathroom, outlined in dirt.
Weather dependent, the pour might take place this week.
Head Design Chief
Apparently, Zippy had some questions about the wall locations yesterday evening when we were over for a short visit.
- A

Wednesday, February 16, 2011

Silver Lining Up the Stairs

With warmer, dryer weather this week, they've been working on finishing up the exterior of the house. Now that the roof is on, they've been putting up the ridge foam insulation (the silver coating) on the bulk of the house. As they finish the foamboard, next come the windows and window trim.

Foam on, windows in
The lifts they use to get up to the top of the walls are pretty cool. There is a 'jack' that connects to the long, vertical beam. To go 'up', a person sits on each jack, and at the same time releases a locking brake and starts cranking a handle; the jacks, with the beams spanning them, as well as the people, start walking up the beams to the new height.

The view from our neighbors backyard at the back 3 levels...
The seams of the foam panels are taped from the outside to provide the 'moisture barrier' for the house. The foam provides an initial an R-5 rating and, most importantly, blocks heat transfer from the wall studs (where there is no insulation) to the outside.

Oddly, they've left the side with the fewest windows to do last.
The big surprise was that insulation and windows is apparently just a 2 person job. The other two were inside building our stairs!

Up the stairwell from the basement. They've roughed in the upper stairs.
- A