Showing posts with label bedroom. Show all posts
Showing posts with label bedroom. Show all posts

Wednesday, August 17, 2011

Realizations

We haven't felt the need to blog lately because, well, the house building is pretty uneventful right now. We're mostly just getting settled and waiting for some key professional landscaping ingredients. However, inside we have realized a couple of things:

a. Despite being 20 feet wide, there's a lot of open space in the house. Or maybe it's just that we don't have very much furniture. This is proving to be a positive in Natalie's book- especially as she learns to walk with her little car back and forth and back and forth and back and forth (and back and forth). Plus we have plenty of room for a tent and tunnel in our living room- and isn't that just every child's dream? Twenty feet wide is proving to be plenty big so far.

...and back and forth

b. Our shiny new house makes the furniture we do have look ugly.
Like maybe it came from the streets of Boston on "big trash day" or the "as is" section of Ikea or something. We've been taking what we have and all the little things we saved and trying to give it all a place in our new life. We certainly don't *need* new stuff, we're living comfortably and fine with what we have. Paint can do wonders. Fabric can be reused. Hardware is available on something your husband called trash three days ago.

No, I'm not going to show you a picture of our ugly furniture.
I'm going with these cute window treatments instead.
My mother was intrigued by the challenge of creating roman shades for Natalie's room by taking apart old venetian blinds from our last house to use as parts.

c. We're too afraid to commit to hanging pictures and other things that require holes in our pretty new walls. Heck, we're too afraid to commit to buying floor mats for the front door and that certainly doesn't require holes. I think this drove my parents crazy last week during their visit. How many times did we hear, "You know, you should really put something to hang towels on in the bathroom." or "You really should get a mat for the front door." After rushing to commit and decide so much in the past year we have now slowed down considerably. Yes we know things like this can be changed, but knowing us, once we've committed $12.99 to a floor mat, it's not going to be changed until it literally falls apart. Therein lies the fear of commitment.

Note the artwork resting on the repainted shelf in the background.
Feel free to come over and vote where you think it should be hung.
-J

Sunday, June 26, 2011

The Good, the Bad, and the Crapper

Evidence of the plumber's work on Friday

A trip to the house on Friday revealed water in the toilets. Pretty exciting, I know. However, Friday night also revealed water coming through the kitchen ceiling (bathtub above). Not so joyous. We marked the spot and it doesn't seem to be spreading, so we hope it's not anything serious. I did stop packing things in the nearby cabinets in case they have to come down to fix the issue.

Stairs to basement- shelf along back wall finished

Other evidence of work showed that Rob and co. also worked on the stairs, balusters, railings, and the trim around the stairs, and John sealed part of the floor during the day. John was also over Saturday morning setting the footings for the side entryway. Plenty of happenings, but I kept feeling like it was all things that should've been happening last week, or perhaps Thursday at the very least.

No more worries about falling off the upstairs landing

side entry footings

I have to say, my master carpenter, Anthony, has been doing stellar work in the middle of the night. He cut a beautiful hole for our new sink and secured all the counter tops. I think he likes the fact that the new sink has such right angles- easier to cut the top for it!

Kitchen sink in and ready for the plumber

We've also started moving things over as much as possible. As I previously mentioned, we have to move out of our rental by the end of the month. We may not be ready, but at least our stuff can live in the new house in the rooms that are done (like the upstairs bedrooms).

Anthony and Kevin moving our stuff.
Kevin is a major trooper to help us move out in December and then back in again now.
He even brought his own beer this time.

After moving the washer/dryer out in December, Anthony and Kevin decided it was pretty heavy and called in a third helper, Dave.

It's a little extra work on both ends with this move because we have to be careful to keep our stuff at the new house out of the way of any workers, we have to restore the rental house to its exact previous glory, and we have to keep out a set of items for us to live off of wherever we end up until we can really move in. Fortunately this will be our final move!

Kevin has his own dolly.
I think that pretty much pegs you to help people move.
We're very grateful for this.
-J

Monday, June 20, 2011

Will Work for Lobstah

Too busy to blog these days, but at least that means that things are getting done. The stairs are being formed before our very eyes, and so far they look great. We're still in the town's work order queue to switch out our water valve, but we hear Wednesday could be our lucky day. The concrete basement floor staining and sealing is still a bit of a question mark, but we're hopeful that will be resolved this week as well. We're thinking Sandlot Gray for a color, but more importantly we're hoping it'll happen quickly.

Stairs being formed- note the picture printed out and taped up as a guide.

There are some tall places to paint in our house. Good thing Anthony is tall.

We brought in our personal labor force again this week. My parents arrived on Tuesday and the only times I've seen them put down their paintbrushes so far were to help me with school tasks (grading papers and packing up my classroom) and for Natalie's baptism and our Father's Day dinner. Anthony and the two of them have been working non-stop painting the walls, trim and interior doors.

My mom finishing painting the kitchen.

My dad: painting doors is back-breaking work.

The paint decision has been a bit scary, which it shouldn't be since it's probably the easiest thing in our house that we can change. I've been collecting and staring at paint chips for months now, and finally had to commit. Of course, just when you've made a decision someone (like the paint store guy, Ken) has to step in and tell you their dissenting opinion, like that your yellow is too bright. So far I'm really happy with most of the colors. However, I did end up back at the paint store on Saturday to let Ken know that he was right about my yellow and could he please help me lighten it? (He tried his best.) All in all though the paint is making the place feel more put-together.

Natalie in her first-try yellow room.

Anthony's family came in on Friday and his dad joined in the fun on Saturday while Mali, Jeanie, Natalie and I drove up to Ikea to pick up the final piece of countertop, which Anthony and my dad then cut and placed on Sunday.

Anthony's dad filling in nail holes. For the record I did offer him knee pads.
Full speed ahead!
-J

Thursday, June 2, 2011

The Beginning of the End

As both of our readers must surely know by now, we've had some issues with our floor. Over the past 4 months these issues have at times prevented us from knowing what types of wood floors could be installed over radiant heating, prevented us from planning the stairs and stair railings, and preventing us, our builder, the stair guy, the floor guy, the other floor guy, and the other floor guy's installer from having an enjoyable time talking about this process. I've not even mentioned the poor girl from Home Depot that we put through the ringer.

So, when a pallet of boxes containing 1400 square feet of lightly-stained, eco-core, engineered tongue and groove hickory arrived at the house yesterday morning and were quickly opened and utilized...it was very exciting.


Thankfully, the flooring installers did a great job: showing up early, leaving late, finishing a floor a day. Below are some pictures of the job in process and finished.






Saturday, April 23, 2011

What Two Can Do

The mom and dad crew continued to slave away yesterday on their own. They managed to complete all three bedrooms. So what if they can no longer stand up straight? At least they know that this winter they can come back and lie down on an all-house-heating-pad-of-a-floor.

My parents pressing and screwing aluminum panels into the plywood tracks.
Yes, we're putting even more metal into this house!

Anthony returned home in the late evening, and then sometime in the middle of the night got worried that it would rain on our plywood. He entered into a crazy can't-find-the-tarps-solution-seeking fiasco that eventually involved him single-handedly moving all the plywood and then covering it with shower curtains. He was quite disappointed when he woke up this morning and it wasn't raining yet. But then you could just hear his inner voice squeaking "I knew it" in delight when the rain started up mid-morning.
- J

Thursday, April 21, 2011

Let there be light!

Lights on in the stairway going into the basement

Yes, light- along with a kitchen in boxes, outside trim painted, insulation in the attic, and radiant panels in the floor.

It was certainly a busy day in and around our little house today. At one point my mom counted 12 people besides us working! So let's back up...

The house was spray primed inside by the painters yesterday.
It was also a marathon day for us at Ikea where the kitchen was finalized, purchased, and loaded into two vehicles (thanks to my parents for meeting us there). I'm so glad we did this on a Wednesday evening. I could not imagine trying to brave a giant purchase like that with the throngs of Boston weekenders.

Checking off our five carts of kitchen cabinets

Lumber delivery

Good old Falmouth Lumber delivered our plywood this morning. Our crew (Anthony and my parents) began cutting strips to create our radiant panels. Zippy also got his spring haircut by my mom in the morning.

An electrician and painter share the yard for prep work as Anthony and my parents cut the plywood strips that the pex tubing will run between for the radiant floor heating

The electricians came and busied themselves. By mid-afternoon the house was powered up, the lights on, and our temporary power supply pole was taken down. Zippy doesn't know this yet, but we now have a working doorbell.

The lights in the kitchen are on!

The insulation guys blew some more into the attic. I thought of our across-the-street neighbor when I saw their truck pull up. A couple of days ago she remarked that she had seem them come and insulate our house, and then it seems like they keep coming back and doing more insulation. Yup. That's the idea with this house. I only want to feel the breeze if I'm sitting on the porch!

Insulation being blown into the attic hatch from the upstairs bathroom

The painters came and worked on the trim. By this time, the sunshine, their radio, and the vast amounts of people around made it seem like a beach party. I guess it is spring break.

Painters working on the trim on the back of the house

By the afternoon our crew had joined the inside ranks. They worked hard laying out the pieces of the radiant floor puzzle upstairs. And to think that they'll work for Cape Cod Potato Chips and granddaughter giggles- we're pretty fortunate! Two rooms upstairs were laid out and secured by dinnertime.

Anthony and I went back and started a third room after dinner. The plan was to continue tomorrow, but the ocean called Anthony away so we'll be on our own without him to supervise. Yikes!
- J

Tuesday, April 12, 2011

Caffeinated Results

The Mountain Dew and Red Bull seemed to work. The blueboard is all hung (shown below) and plastered (not shown here). No more walking through walls- the real house has taken its form.

Looking down the upstairs hallway from the Master Bedroom

In the Master bedroom, looking toward the closet

Main Floor- the ladder is in the kitchen

Main Floor, looking toward the stairs, dining room and front door

Office in the basement
The shelves below the windowsills are a remnant of the thicker concrete walls along the bottom part of the walk-out basement.

Meanwhile the decisions are still flying at us fast and furious. We're keeping up and trying to stay slightly ahead of the game the best we can!
- J

Friday, April 8, 2011

Daily Reflections

I feel like every time I visit the house I stand in awe of the day's accomplishments. Sometimes big, sometimes small, these raw changes transform the space into something that I either never really thought I'd actually see (which often results in a "Jodes, you won't believe what...") or that I didn't expect to see (which often results in a "John, I'm confused why...").

This past week and a half has garnered many of each type of response:


Saturday/Sunday: This is the basement window along the south side of the house. Insulating the basement became a bit more involved toward the back of the house. 3" of rigid foam exists behind and between the 2x3 studs where they back up to the concrete foundation. Above this, cellulose was blown in behind a mess into the 2x6 studs of the outside wall. Remember that there is an inch of rigid foam on the exterior of the above-ground sections well.


Monday: You are looking at the ceiling of the main floor. 6" of fiberglass provides sound-proofing between levels. The insulated supply lines for the upper zone of radiant heating is visible as well.

Tuesday: As quality insulation was a big part of our hopes for the house, we've tried to use blown-in cellulose where ever possible on the exterior walls. It works better per unit R value than fiberglass (it's all about the installation). This caused some communication issues when something else was placed there instead. The area along the outer wall where the floor joists are supported was one of those places. However after talking with John, he had the sub pull it out and pour foam instead (shown here in the yellow color).

By now most of the cellulose has been put in the master bedroom outer wall, up to the ceiling, dampening out most of the noise.


Another look at one of the forward bedrooms and upstairs bathroom with insulation.


Wednesday: The main level is now quiet as a tomb. Although I suspect that it will not stop Jody from tap dancing again.

Thursday: More sound proofing for the interior walls on the top floor. You used to be able to see through to the back windows from the stairs, and walk through all the walls but alas, no more!


Friday: Oh my gosh!(Okay, maybe I said something else...) Today they not only delivered all the blueboard and plaster but they put it up in half of the 2nd floor. This front bedroom is completely finished, as is most of the bathroom.

A view from the outside corner of the same room. The closet/stage is almost ready to go.

The drywallers have left their jar of peanut butter, jar of jelly and loaf of bread upstairs, so I know they'll be back soon.

- A

Tuesday, February 22, 2011

Decision-Time for the Wafflers

The inside of "the silver bullet" is taking off as well. The second floor interior is now framed. We did a walk-through today with John, our contractor, and Alison, our architect. It's amazing to see the rooms we envisioned take shape.
Natalie and I on the top floor
From inside the closet, looking through to the bedroom
The decisions are still flying at us fast and furious. This means we spend our weekends sitting in bathtubs (in stores) and our daughter thinks hanging out in shower stalls is a fancy form of peek-a-boo entertainment. And those are the easy decisions. Then there are the ones like how to frame the stairs and how to do the radiant floor heating.

Cucumbers please!
Peek-a-boo!
I'm sometimes flabbergasted that these are still such a challenge to figure out- even with a builder, an architect, and a phd (I know- oceans, not houses) all staring at the same problem. Part of the challenge, obviously, is that the phd spent so much time in school, that the cost-effective angle has to weigh strongly. (That and the fact that he studied oceanography, not plumbing.)

How do you support floating stairs? And where do you put the lightswitches if there's no wall?
John, Alison, and Anthony brainstorming.
So let's see- here's what we have done in the past few days. We picked out a tub, semi-settled on a shower, chose porch materials, selected the basement insulation level, decided on how to build a closet over the stairs (but still maintain headroom), determined where attic access would be, pretty much designed the kitchen, almost committed to cabinets, debated the heating, stairs-framing, and lighting plan, in addition to updating our gotta-figure-out spreadsheet on a regular basis.
-J