Wednesday, July 27, 2011

Builder 1, Inspector 0.

Well, maybe builder -32 (up from -33), inspector 435 would be more accurate, but we'll still take the win. I'll spare you the dramatic build up...our house finally passed inspection. But, as per usual, even try #3 was not without its own drama.

With Natalie at "school" for the day, Jody and Zippy spent Monday, inspection #3 day, out of the house to accommodate a visit from the town. She returned mid-afternoon to find a cryptic note on the permit where the signature should have gone, saying only "thermostats not programmable?" Hearing of this at work from Jody, I relayed the news to John the Builder via a phone message. In truth, I also though it might be good to have fancy thermostats. We started with programmable thermostats, but they didn't work, as someone installed the wrong wires during rough in. Last week the plumbers replaced the non-working ones with old school dial thermostats. Apparently, with radiant floor heat, dials are just as good...so there you go.

10 minutes later John called back, hopping mad, and read me the appropriate line from the current edition of the Mass. State Building Codes that said programmable thermostats were required with forced-air systems, but made no mention of other heat sources. He followed up with some choice words about the inspector's level of competency. The next morning at 8am, he was at town hall to figuratively - and perhaps literally, I don't know, I wasn't there - throw the book at them.

Relaying the conversation to me later, John said that both the inspectors and the building commissioner insisted that programmable units- at least one per house they said- were required. Sliding his copy of the building code across the counter, John challenged them, "Show me where it says that." Apparently the office effectively shut down for some time, as the group of them searched the very code they are supposed to follow for something they've been requiring for years.

Finding nothing but the line John read to me over the phone, they quickly signed the permit and shuffled him onto his next stop.

So, what remains? A signature from Conservation -which could get interesting- and finalizing the loan paperwork, but occupying the structure is no longer an issue.

Stepping back for a moment, it's been surprising to me how much the events of the last few weeks have seeped into our daily lives. Yesterday I caught Jody and Natalie playing a game I now refer to as Building Inspector. They had set up little fabric block buildings on the floor (see below) and as Natalie would knock them over, Jody would call out things like "No permit for you!" or "Failed! This railing is an inch too low." or "Your bottom step is not at grade!"


Natalie playing building inspector with mom. "The roof on this one looks a little loose!"


-A





Saturday, July 2, 2011

Homeless, again

Once again, we have found ourselves pseudo-homeless. This seems to happen to us a lot when planning to move. The timing just never quite lines up exactly. Of course, this time we get to be "between homes" with a very active 11 month-old and an over-anxious dog. In the past, it always worked out...eventually, so I have faith that this one will too.

This time we had to be out of our rental by the end of June, so throughout the week, before and after work each day, we incrementally moved all of our belongings into the bedrooms of our own house - the parts the were fully complete. July 1st rolled around and our house was not finished and livable, so we headed to New York to visit the fam for a while and hopefully give the workers a bit more time to pull it all together.

The risky part about this is that without us there checking up on daily progress (ahem, micromanaging... and yes, we feel it helps), things just might not happen. Or, of course, they might happen, but in a not-the-way-we-intended way.

So what has happened and what remains? The stair guy has been working at pace that Anthony politely describes as 'quite un-feverish' for the past few weeks to complete was has become (according to the stair guy) a very unique set of steps. This has resulted in piles of debris, saws, tools, compressors, cords, and cups that have covered the entire main floor.

The large amount of tools, saws, etc. required to complete the stair trim.

The side entryway was also done. Of course, in typical construction fashion the decking material we used on the front porch four months ago is now no longer made and was not to be found anywhere so we had to settle for a slightly different product (sigh).

The new side/mudroom entry deck.

The rest of the electrical work was finished. The faucets and tub/shower trim were all connected, and the earlier water leak resolved without much issue.

The glitch that did occur was that the wrong bath/shower trim was still installed, despite our efforts back in March to correct our trim order from an earlier mistake! We're beginning to wonder if they're just trying to wear us down. While I realize this is a minor issue in the grand scheme of things, as we'd been here before with the builder, it made it all the more frustrating to have to ask once again to have the mistake fixed.

Towards the end of the week, the stair guy(s) finally wrapped up their work and cleaned up their mess, leaving a nice clean set of stairs and clear floor. It was great to see the 'almost' finished product.


The stairs to the basement, finally!

View of the stairs and kitchen from the living-room area.
We realized our refrigerator is pretty small. Plenty of room to grow...

Natalie enjoying the clean, clear main floor for the first time.

So, now we're ready for the floor guy to come back and finish up the connecting areas. All the doorknobs are in the house ready to be installed. Some trim work needs to be finished and a few things, like some uneven dry wall work in the upstairs bathroom, need to be fixed.

The big hold-up however seems to be that the plumber cannot get the boiler to work. The current plan is to have the company rep. come out on Wednesday to take a look at it. Hopefully then we can check that off.

The boiler, mixing valve, and indirect water heater complex, currently at rest as the boiler will not start. Who really needs hot water?

-J



Sunday, June 26, 2011

The Good, the Bad, and the Crapper

Evidence of the plumber's work on Friday

A trip to the house on Friday revealed water in the toilets. Pretty exciting, I know. However, Friday night also revealed water coming through the kitchen ceiling (bathtub above). Not so joyous. We marked the spot and it doesn't seem to be spreading, so we hope it's not anything serious. I did stop packing things in the nearby cabinets in case they have to come down to fix the issue.

Stairs to basement- shelf along back wall finished

Other evidence of work showed that Rob and co. also worked on the stairs, balusters, railings, and the trim around the stairs, and John sealed part of the floor during the day. John was also over Saturday morning setting the footings for the side entryway. Plenty of happenings, but I kept feeling like it was all things that should've been happening last week, or perhaps Thursday at the very least.

No more worries about falling off the upstairs landing

side entry footings

I have to say, my master carpenter, Anthony, has been doing stellar work in the middle of the night. He cut a beautiful hole for our new sink and secured all the counter tops. I think he likes the fact that the new sink has such right angles- easier to cut the top for it!

Kitchen sink in and ready for the plumber

We've also started moving things over as much as possible. As I previously mentioned, we have to move out of our rental by the end of the month. We may not be ready, but at least our stuff can live in the new house in the rooms that are done (like the upstairs bedrooms).

Anthony and Kevin moving our stuff.
Kevin is a major trooper to help us move out in December and then back in again now.
He even brought his own beer this time.

After moving the washer/dryer out in December, Anthony and Kevin decided it was pretty heavy and called in a third helper, Dave.

It's a little extra work on both ends with this move because we have to be careful to keep our stuff at the new house out of the way of any workers, we have to restore the rental house to its exact previous glory, and we have to keep out a set of items for us to live off of wherever we end up until we can really move in. Fortunately this will be our final move!

Kevin has his own dolly.
I think that pretty much pegs you to help people move.
We're very grateful for this.
-J

Friday, June 24, 2011

The Kitchen Sink is Our Fat Lady

I think with house building it can't be over until the kitchen sink is in and plumbed, and ours is sure toying with us enough! Let's recap yesterday (Thursday 6/23):

This is where we left off two days ago.
The stairs are stained and ready for their railings and balusters.

Again the day started promising enough with a truck in the driveway. Rob, our contractor's "guy", was supposedly in the house doing his work on the stairs. Then *poof* he was gone by 9:30, although he did leave all the lights on. (Apparently he didn't have my parents growing up-always asking who pays the electric bills and reminding him to turn the lights off.)

So nothing happened for a while and then he came back an hour or so later, turned off the lights and left again. We later found out that he was taking himself to the ER because he hurt his ribs.

Since the house was empty I spent part of the day moving kitchen wares over to our new cabinets so that I could reset the rental kitchen to the way it was. That's the hard part about renting this "summer house". It came furnished and we had moved all of "their stuff" out of the way to use "our stuff". Resetting it involves studying the pictures I took when we moved in and trying to return it to its original state.

The DPW guys came back in the early afternoon and told me they'd pave their patch of torn up sidewalk/driveway near the street today or tomorrow. That would just leave another little patch that we would be responsible for repaving. I shared some brownies with them.

Anthony had some phone conversations and discovered that the kitchen sink and faucet had indeed not been ordered by anyone and that the upstairs bathroom faucet had been ordered with the wrong finish. Yes, we have tried to let other people take on tasks and do their own jobs, but really it comes down to if we want it our way we should just do it. Sooooo off I went to pick up the kitchen sink and faucet.

This picture was taken today (Friday 6/24/11).
Our new classy driveway.We are thankful for the whole thing being patched.
Yes, there are workers at our right now, including a plumber! Rob is also back to work.
Lots of activity over there, so although this post may be dismal, we can sill be hopeful.

We returned home to the entire hole in the driveway repaved and some pinkish floor stain around the edge of the utility room on the basement floor. It wasn't supposed to be pink. It was supposed to be tannish-gray. Also, concrete floor stain is nothing like wood stain apparently. It went on more like paint. It was not what we had intended at all. So we back-pedaled and went back to the idea of just sealing it and calling it done. Anyone need two cans of concrete floor stain?

Note the stain around the edge of the utility room. Even Natalie looks bewildered.

We spent the evening both moving things over and prepping the sinks and counter holes for the plumber. The first sink (a round one for the basement bathroom) went together so nice and easy. (That's why we were doomed...)

Round sink for downstairs bathroom/laundry area

Our just-purchased kitchen sink of course couldn't be simple. It was going to be really big in the space. Do-able? Probably. Ideal? Of course not. So we decided that a tomorrow morning run to Lowe's (they open at 6!) was in the works to try to find a more suitable fit, while still holding onto our criteria of me being able to hide dishes in a deep sink.

So with exactly one week before we have to move out of our rental house, I feel great strides were not made yesterday. Perhaps I should head to the basement of the rental house and see if I can find our tent so we'll have somewhere to live.
-J

Wednesday, June 22, 2011

Water Valve Wednesday

Somehow I knew in the back of my mind that ending the previous blog post with "full speed ahead" would just make us come to a screeching halt. You know, the kind where you're frowning at a huge hole saying to yourself, "I thought I was done staring at holes on this property" and wondering if it would make more sense to just go get what's left of your money, toss it in the hole, cover it up with dirt and call it all done. I don't think that would help get us any closer to actually getting into the house though.

The day started off promising enough. The stairs had been stained yesterday and there were floor people milling about this morning, although they weren't here long and I'm not really sure what they did. Then the Department of Public Works (DPW) came by to switch out the water valve, and that's where things got more complicated.

A full driveway first thing in the morning always holds such promise.

Apparently, a lazy predecessor neglected to follow the rules and bring their line the entire length under the driveway as everyone previously assumed. (Huh- more corners cut in the previous shack- imagine that!) Options were discussed, sympathies expressed, but really the only choice in doing it right was to call back our faithful excavator, George, to dig up more of the paved driveway to find where the other guys left off and correctly tie into that, so that the entire run would be the proper one inch plastic pipe.

At one point there were no fewer than 9 of us staring at the hole: the DPW guys, George's guy Mike, myself, John the contractor, and a couple of neighbors.

Fortunately George was just around the corner and was over within the hour with his cute red "digger".

George in the hole. John and 2 DPW guys look on. The blue is the new 1 inch pipe we're supposed to have (and thought we had), as opposed to the copper 3/4 inch one that's hidden under part of the driveway.

As our contractor, John, said today, "Nothing's ever easy." Not when you want it to be anyway.

Apparently the DPW guys will be back on Friday to pave their section over the sidewalk. I'm not quite sure what that means for the other section. To think, we had originally debated about moving the driveway, but changed our minds because it was fine and in good shape.

So that's that. It's switched. We've now got what the town considers a proper water line and a more-current-than-1940 valve, so we're ready to go. If there is a plumber at our house tomorrow, I will be very happy.
-J

Monday, June 20, 2011

Will Work for Lobstah

Too busy to blog these days, but at least that means that things are getting done. The stairs are being formed before our very eyes, and so far they look great. We're still in the town's work order queue to switch out our water valve, but we hear Wednesday could be our lucky day. The concrete basement floor staining and sealing is still a bit of a question mark, but we're hopeful that will be resolved this week as well. We're thinking Sandlot Gray for a color, but more importantly we're hoping it'll happen quickly.

Stairs being formed- note the picture printed out and taped up as a guide.

There are some tall places to paint in our house. Good thing Anthony is tall.

We brought in our personal labor force again this week. My parents arrived on Tuesday and the only times I've seen them put down their paintbrushes so far were to help me with school tasks (grading papers and packing up my classroom) and for Natalie's baptism and our Father's Day dinner. Anthony and the two of them have been working non-stop painting the walls, trim and interior doors.

My mom finishing painting the kitchen.

My dad: painting doors is back-breaking work.

The paint decision has been a bit scary, which it shouldn't be since it's probably the easiest thing in our house that we can change. I've been collecting and staring at paint chips for months now, and finally had to commit. Of course, just when you've made a decision someone (like the paint store guy, Ken) has to step in and tell you their dissenting opinion, like that your yellow is too bright. So far I'm really happy with most of the colors. However, I did end up back at the paint store on Saturday to let Ken know that he was right about my yellow and could he please help me lighten it? (He tried his best.) All in all though the paint is making the place feel more put-together.

Natalie in her first-try yellow room.

Anthony's family came in on Friday and his dad joined in the fun on Saturday while Mali, Jeanie, Natalie and I drove up to Ikea to pick up the final piece of countertop, which Anthony and my dad then cut and placed on Sunday.

Anthony's dad filling in nail holes. For the record I did offer him knee pads.
Full speed ahead!
-J

Saturday, June 11, 2011

Who's Choreographing this Dance Anyway?

I was on the T last year when it was stopped for quite a while underground. I kept thinking I should've just gotten off at the last stop and walked a little farther (you gotta love hindsight- the only time I can claim perfect vision). The frustrating part was that I was in the front car and I could see the light at the end of the tunnel, but I couldn't do anything about the delay to help us get moving and on our way. Such are our feelings about our house right now. There are little things that are happening, but then there are things that we want to happen that aren't. We just need to get all our ducks in a row.

We'll start with the bright side for a run-down of the latest...
The view came into greater focus when the plastic came off the windows and the screens were put on.

Master Bedroom

The plumber has been in hooking up a jumble of pipes in the basement. I think Anthony's glad his part of the plumbing is over.


Stair parts are finally in and scheduled for the middle of this week. We've been told that part will go quickly, but we were told that about the trim which took FOR EV ER.

We've spent our time doing what we can to get things done. My favorite Anthony-project was crafting a stand for our vessel sink and faucet for the "Kamp bathroom". (Yes, if you give us things for our house we will name a room after you too.) I absolutely love how it turned out. The top is actually the old floorboards from the basement of the house we tore down.

View of mudroom entrance and "Kamp bathroom" with homemade vanity.

Our GE (plug for Jason) range and microwave arrived for the kitchen and Anthony is finishing the cabinet trim and toe kicks and getting things ready so that they can be installed. Apparently this will involve changing the plug on the microwave so it can go into Massachusetts' fancy outlets.

There is still one piece of missing temporary countertop. Remember about two weeks ago when I said the missing piece would be in stock in a week? Yeah, that didn't happen, and like a comedy show we have been running ourselves mad trying to figure out a temporary solution for our temporary top. We were set to go check out a craigslist option tomorrow when Ikea called and CONFIRMED (whatever that means) that it would definitely be in by next weekend. So we're taking our chances and waiting it out again. Which holds up the sink/faucet... But that's okay because it's already held up by the water issue.

Ahh, the water issue. The town won't let us have water until they change a valve. Apparently we're in the "queue" for this. I wonder when that will happen. Therefore we have toilets both in our dining room and our shed waiting to be installed as well.

Dining room with toilet parts and stair parts

It's okay, we can't really put the one in the shed in yet since the basement floor has not been etched or sealed yet anyway. That's why the vanity and washer/dryer for that bathroom are still in the rental house.

I'd be lying if I said we weren't getting anxious.
-J

Friday, April 8, 2011

Daily Reflections

I feel like every time I visit the house I stand in awe of the day's accomplishments. Sometimes big, sometimes small, these raw changes transform the space into something that I either never really thought I'd actually see (which often results in a "Jodes, you won't believe what...") or that I didn't expect to see (which often results in a "John, I'm confused why...").

This past week and a half has garnered many of each type of response:


Saturday/Sunday: This is the basement window along the south side of the house. Insulating the basement became a bit more involved toward the back of the house. 3" of rigid foam exists behind and between the 2x3 studs where they back up to the concrete foundation. Above this, cellulose was blown in behind a mess into the 2x6 studs of the outside wall. Remember that there is an inch of rigid foam on the exterior of the above-ground sections well.


Monday: You are looking at the ceiling of the main floor. 6" of fiberglass provides sound-proofing between levels. The insulated supply lines for the upper zone of radiant heating is visible as well.

Tuesday: As quality insulation was a big part of our hopes for the house, we've tried to use blown-in cellulose where ever possible on the exterior walls. It works better per unit R value than fiberglass (it's all about the installation). This caused some communication issues when something else was placed there instead. The area along the outer wall where the floor joists are supported was one of those places. However after talking with John, he had the sub pull it out and pour foam instead (shown here in the yellow color).

By now most of the cellulose has been put in the master bedroom outer wall, up to the ceiling, dampening out most of the noise.


Another look at one of the forward bedrooms and upstairs bathroom with insulation.


Wednesday: The main level is now quiet as a tomb. Although I suspect that it will not stop Jody from tap dancing again.

Thursday: More sound proofing for the interior walls on the top floor. You used to be able to see through to the back windows from the stairs, and walk through all the walls but alas, no more!


Friday: Oh my gosh!(Okay, maybe I said something else...) Today they not only delivered all the blueboard and plaster but they put it up in half of the 2nd floor. This front bedroom is completely finished, as is most of the bathroom.

A view from the outside corner of the same room. The closet/stage is almost ready to go.

The drywallers have left their jar of peanut butter, jar of jelly and loaf of bread upstairs, so I know they'll be back soon.

- A

Tuesday, March 22, 2011

Show and Tell and a Little Rant

A gratuitous house picture and then let's start with the rant.

The siding was 'pre-primed' in grey. We haven't actually decided on the exterior color yet.

Yesterday I went over to the house to check out what has been happening. While touring the upstairs quarters I noticed a bath fixtures box. Having spent a whole day picking out something I thought I could live with (in terms of style, functionality, and price), I was excited to finally see our fixture installed. But as I opened the box I realized that this was not the one I'd chosen... Although Anthony wasn't with me at that moment, I know he can envision what my face must have looked like: a combination of bewilderment and disbelief that morphed into - dare I say - rage (a similar thing happened when we cut into our wedding cake).

It seems that we're suffering from a growing trend of the people we are paying suggesting alternative 'arrangements' for sinks, toilets, walls and doors that don't take the whole house (or budget) into account, coming up with their own solution without telling us if there is an ambiguity in the plans, or simply ignoring the plans (and not telling us). Dealing with fixture selection and sourcing has been especially difficult. We've continuously been told to pick stuff out as soon as possible (as we're on a schedule) but then told that our selection was either not 'good', or that they have access to a "better" one for some unknown $. Look, I would love to have recommendations and suggestions as long as we can have final approval.

Anyway, after taking some time to cool off, we contacted "the John" via email (it was quite late by then) and asked that he ensure the correct one be installed. In today's trip next door we noticed the offending fixture box had been removed, so hopefully all has been restored. After fighting for these, now I just hope I'm actually happy with them once we're actually living with them.

Despite all that, there are some exciting things happening. An insulation guy was hard at work today putting up the attic vents in preparation for putting in insulation.

Anthony excitedly points out the day's work while Natalie appears bored.

More metal is showing up. Some of it is to make sure the stairs stay where they're supposed to and some of it is to make sure the house stays where it's supposed to.

Metal strapping, complete with way too many nails, connects the landing to the floor joist above allowing the open space and light of the living area (where the picture was taken from) to flow all the way down into the basement

Giant, 50-bolt straps from **** and...
7 foot long threaded rods tie the main floor decking and main floor walls down to the foundation. Again, we'd not going to dare a tropical storm, but...

In addition, the electrical, plumbing, and gas tie-ins (outside the house) continue to be planned for and put in. These have brought up some odd compromises. Since the boiler vent has to be more than 4 feet away from the gas meter, which has to be more than 4 to 5 feet away from the electric meter, which has to more than 6-7 feet above the water line, not all of these can fit on the right front corner of the house (where the wall is ~10 feet long) as we'd prefer. At least one has to be placed on the opposite (south) side and come across the house inside. So much for saving money by placing all the inside utilities close together...

- J

Monday, March 21, 2011

This Isn't All We Do


Although our daughter may think grooving to tunes while choosing fixtures is the cat's pajamas- we would like to officially post this here to let her know that that kind of superfun is only made possible by the lives we started before she came along.

Deploying moorings off of Nauset along the outer (lower) part of Cape Cod, a self portrait (of me, Craig was collateral damage)

So for her, and the one of our two readers who might have thought otherwise, let the record show that we actually do work. For example, last week, along with my busy schedule of micro-managing the house construction and annoying our builder, the plumber, and most of the radiant floor heating experts east of the Mississippi, I managed to do some field work. We were deploying a set of moorings off the coast of Nauset, MA to look at the advection of Gulf of Maine freshwater along the Cape Cod Coast. Unfortunately, I've been told that this doesn't make me an expert in plumbing.

How do we have the time to lead these exciting multiple lives? Apparently being woken up at regular intervals every night gives you extra time to pick out fixtures, review papers, and write lesson plans.

- A