The past few days we've experienced what I'll call the 'end-of-framing' blues. Work on the house was progressing rapidly for the longest time. For 2 months now, we've been watching framers arrive on site early in the morning, a stream of delivery trucks placing pallets of 'stuff' right into the house or onto the roof, and the constant sounds of banging, nailing (thwack!) and sawing (along with the swearing). This has all been matched with massive daily changes to the house; a new floor, roof, or fully weatherized door. All that activity has stopped.

The basement framing was completed this week. Our goal is for a 95% finished basement. The office (on the left ) was originally more open, but strangely the zoning board told us to case in this opening to prevent us from putting a door there (so that it couldn't be a bedroom.) It seems more of a private space this way, but whatever.

This week, even though there were sometimes as many as 7 or 8 cars in front of our hours each day, the changes are all small. It turns out that electricians and plumbers don't get to work until 9:00 or even 10. And still, at the end of the day, you have to now what you are looking for to see the daily changes. When we go over after work it's like a scavenger hunt to find the evidence of the day's activities. Sure we now have thousands of feet of electric wiring in the house, phone and ethernet cable ports we are unlikely to ever use, and plumbing vents snaking from basement to ceiling, but these are not 'wow'-causing additions to the structure. It's a little less dramatic noticing the extra wire or pipe that wasn't there the day before.

(Here's a riddle for you: How many phone jacks do you need in your house for the next 10 years if you've exclusively used cell phones for the past 10 years?)

Our first agonizing decision, the upstairs tub.
Can YOU tell it's bigger than the other second choice?

But today, the tub and shower were placed and plumbed in...causing enough wow to necessitate a post. Although, as always, they look a lot smaller to me than they did in the store.


The downstairs shower, roughed in with the valve and faucet installed.

Inspection sticker! An important addition to the plumbing vent pipes.