Saturday, July 2, 2011

Homeless, again

Once again, we have found ourselves pseudo-homeless. This seems to happen to us a lot when planning to move. The timing just never quite lines up exactly. Of course, this time we get to be "between homes" with a very active 11 month-old and an over-anxious dog. In the past, it always worked out...eventually, so I have faith that this one will too.

This time we had to be out of our rental by the end of June, so throughout the week, before and after work each day, we incrementally moved all of our belongings into the bedrooms of our own house - the parts the were fully complete. July 1st rolled around and our house was not finished and livable, so we headed to New York to visit the fam for a while and hopefully give the workers a bit more time to pull it all together.

The risky part about this is that without us there checking up on daily progress (ahem, micromanaging... and yes, we feel it helps), things just might not happen. Or, of course, they might happen, but in a not-the-way-we-intended way.

So what has happened and what remains? The stair guy has been working at pace that Anthony politely describes as 'quite un-feverish' for the past few weeks to complete was has become (according to the stair guy) a very unique set of steps. This has resulted in piles of debris, saws, tools, compressors, cords, and cups that have covered the entire main floor.

The large amount of tools, saws, etc. required to complete the stair trim.

The side entryway was also done. Of course, in typical construction fashion the decking material we used on the front porch four months ago is now no longer made and was not to be found anywhere so we had to settle for a slightly different product (sigh).

The new side/mudroom entry deck.

The rest of the electrical work was finished. The faucets and tub/shower trim were all connected, and the earlier water leak resolved without much issue.

The glitch that did occur was that the wrong bath/shower trim was still installed, despite our efforts back in March to correct our trim order from an earlier mistake! We're beginning to wonder if they're just trying to wear us down. While I realize this is a minor issue in the grand scheme of things, as we'd been here before with the builder, it made it all the more frustrating to have to ask once again to have the mistake fixed.

Towards the end of the week, the stair guy(s) finally wrapped up their work and cleaned up their mess, leaving a nice clean set of stairs and clear floor. It was great to see the 'almost' finished product.


The stairs to the basement, finally!

View of the stairs and kitchen from the living-room area.
We realized our refrigerator is pretty small. Plenty of room to grow...

Natalie enjoying the clean, clear main floor for the first time.

So, now we're ready for the floor guy to come back and finish up the connecting areas. All the doorknobs are in the house ready to be installed. Some trim work needs to be finished and a few things, like some uneven dry wall work in the upstairs bathroom, need to be fixed.

The big hold-up however seems to be that the plumber cannot get the boiler to work. The current plan is to have the company rep. come out on Wednesday to take a look at it. Hopefully then we can check that off.

The boiler, mixing valve, and indirect water heater complex, currently at rest as the boiler will not start. Who really needs hot water?

-J



Sunday, June 26, 2011

The Good, the Bad, and the Crapper

Evidence of the plumber's work on Friday

A trip to the house on Friday revealed water in the toilets. Pretty exciting, I know. However, Friday night also revealed water coming through the kitchen ceiling (bathtub above). Not so joyous. We marked the spot and it doesn't seem to be spreading, so we hope it's not anything serious. I did stop packing things in the nearby cabinets in case they have to come down to fix the issue.

Stairs to basement- shelf along back wall finished

Other evidence of work showed that Rob and co. also worked on the stairs, balusters, railings, and the trim around the stairs, and John sealed part of the floor during the day. John was also over Saturday morning setting the footings for the side entryway. Plenty of happenings, but I kept feeling like it was all things that should've been happening last week, or perhaps Thursday at the very least.

No more worries about falling off the upstairs landing

side entry footings

I have to say, my master carpenter, Anthony, has been doing stellar work in the middle of the night. He cut a beautiful hole for our new sink and secured all the counter tops. I think he likes the fact that the new sink has such right angles- easier to cut the top for it!

Kitchen sink in and ready for the plumber

We've also started moving things over as much as possible. As I previously mentioned, we have to move out of our rental by the end of the month. We may not be ready, but at least our stuff can live in the new house in the rooms that are done (like the upstairs bedrooms).

Anthony and Kevin moving our stuff.
Kevin is a major trooper to help us move out in December and then back in again now.
He even brought his own beer this time.

After moving the washer/dryer out in December, Anthony and Kevin decided it was pretty heavy and called in a third helper, Dave.

It's a little extra work on both ends with this move because we have to be careful to keep our stuff at the new house out of the way of any workers, we have to restore the rental house to its exact previous glory, and we have to keep out a set of items for us to live off of wherever we end up until we can really move in. Fortunately this will be our final move!

Kevin has his own dolly.
I think that pretty much pegs you to help people move.
We're very grateful for this.
-J

Thursday, June 2, 2011

The Beginning of the End

As both of our readers must surely know by now, we've had some issues with our floor. Over the past 4 months these issues have at times prevented us from knowing what types of wood floors could be installed over radiant heating, prevented us from planning the stairs and stair railings, and preventing us, our builder, the stair guy, the floor guy, the other floor guy, and the other floor guy's installer from having an enjoyable time talking about this process. I've not even mentioned the poor girl from Home Depot that we put through the ringer.

So, when a pallet of boxes containing 1400 square feet of lightly-stained, eco-core, engineered tongue and groove hickory arrived at the house yesterday morning and were quickly opened and utilized...it was very exciting.


Thankfully, the flooring installers did a great job: showing up early, leaving late, finishing a floor a day. Below are some pictures of the job in process and finished.






Saturday, May 28, 2011

Something Under Our Feet

Our tile is in and finished: the mudroom floor, the wall around the tub, and the bathroom floor.

Mudroom tile- It's called "Ayers Rock Cobalto Blue", which I find funny. I've been to Ayers Rock (yes, I did just work that in) and nothing about it reminds me of this tile, nor do I think that the tile or Ayers Rock have much to do with "blue". Maybe that's why we got a sweet discount on it.

Upstairs bathroom: "Stoney Point Grigio" on the floor and white subway tile around the tub.

The floor in the rest of the house was scheduled to be installed Monday, but now that's pushed back until Wednesday. Why? It's complicated. It involves stair guys, floor guys, us, "experts" on the phone in Georgia and the whole-like. What it comes down to is that our people here have been doing things a certain way for thirty years and if we throw them even the smallest design curve ball they balk and spend their time and energy trying to get us to change our minds rather than spending their time and energy embracing the new challenge (even if we're trying to get them to do something that's actually pictured in their own catalog). You would also think stair guys and floor guys had worked with each other before. This does not seem to be the case. This is difficult for Anthony and I to deal with, and I think it's because we both work in professions where learning something new (and collaborating) is celebrated.

So I'm holding my breath until Wednesday now.
-J

Thursday, April 21, 2011

Let there be light!

Lights on in the stairway going into the basement

Yes, light- along with a kitchen in boxes, outside trim painted, insulation in the attic, and radiant panels in the floor.

It was certainly a busy day in and around our little house today. At one point my mom counted 12 people besides us working! So let's back up...

The house was spray primed inside by the painters yesterday.
It was also a marathon day for us at Ikea where the kitchen was finalized, purchased, and loaded into two vehicles (thanks to my parents for meeting us there). I'm so glad we did this on a Wednesday evening. I could not imagine trying to brave a giant purchase like that with the throngs of Boston weekenders.

Checking off our five carts of kitchen cabinets

Lumber delivery

Good old Falmouth Lumber delivered our plywood this morning. Our crew (Anthony and my parents) began cutting strips to create our radiant panels. Zippy also got his spring haircut by my mom in the morning.

An electrician and painter share the yard for prep work as Anthony and my parents cut the plywood strips that the pex tubing will run between for the radiant floor heating

The electricians came and busied themselves. By mid-afternoon the house was powered up, the lights on, and our temporary power supply pole was taken down. Zippy doesn't know this yet, but we now have a working doorbell.

The lights in the kitchen are on!

The insulation guys blew some more into the attic. I thought of our across-the-street neighbor when I saw their truck pull up. A couple of days ago she remarked that she had seem them come and insulate our house, and then it seems like they keep coming back and doing more insulation. Yup. That's the idea with this house. I only want to feel the breeze if I'm sitting on the porch!

Insulation being blown into the attic hatch from the upstairs bathroom

The painters came and worked on the trim. By this time, the sunshine, their radio, and the vast amounts of people around made it seem like a beach party. I guess it is spring break.

Painters working on the trim on the back of the house

By the afternoon our crew had joined the inside ranks. They worked hard laying out the pieces of the radiant floor puzzle upstairs. And to think that they'll work for Cape Cod Potato Chips and granddaughter giggles- we're pretty fortunate! Two rooms upstairs were laid out and secured by dinnertime.

Anthony and I went back and started a third room after dinner. The plan was to continue tomorrow, but the ocean called Anthony away so we'll be on our own without him to supervise. Yikes!
- J

Tuesday, April 12, 2011

Caffeinated Results

The Mountain Dew and Red Bull seemed to work. The blueboard is all hung (shown below) and plastered (not shown here). No more walking through walls- the real house has taken its form.

Looking down the upstairs hallway from the Master Bedroom

In the Master bedroom, looking toward the closet

Main Floor- the ladder is in the kitchen

Main Floor, looking toward the stairs, dining room and front door

Office in the basement
The shelves below the windowsills are a remnant of the thicker concrete walls along the bottom part of the walk-out basement.

Meanwhile the decisions are still flying at us fast and furious. We're keeping up and trying to stay slightly ahead of the game the best we can!
- J

Friday, April 8, 2011

Daily Reflections

I feel like every time I visit the house I stand in awe of the day's accomplishments. Sometimes big, sometimes small, these raw changes transform the space into something that I either never really thought I'd actually see (which often results in a "Jodes, you won't believe what...") or that I didn't expect to see (which often results in a "John, I'm confused why...").

This past week and a half has garnered many of each type of response:


Saturday/Sunday: This is the basement window along the south side of the house. Insulating the basement became a bit more involved toward the back of the house. 3" of rigid foam exists behind and between the 2x3 studs where they back up to the concrete foundation. Above this, cellulose was blown in behind a mess into the 2x6 studs of the outside wall. Remember that there is an inch of rigid foam on the exterior of the above-ground sections well.


Monday: You are looking at the ceiling of the main floor. 6" of fiberglass provides sound-proofing between levels. The insulated supply lines for the upper zone of radiant heating is visible as well.

Tuesday: As quality insulation was a big part of our hopes for the house, we've tried to use blown-in cellulose where ever possible on the exterior walls. It works better per unit R value than fiberglass (it's all about the installation). This caused some communication issues when something else was placed there instead. The area along the outer wall where the floor joists are supported was one of those places. However after talking with John, he had the sub pull it out and pour foam instead (shown here in the yellow color).

By now most of the cellulose has been put in the master bedroom outer wall, up to the ceiling, dampening out most of the noise.


Another look at one of the forward bedrooms and upstairs bathroom with insulation.


Wednesday: The main level is now quiet as a tomb. Although I suspect that it will not stop Jody from tap dancing again.

Thursday: More sound proofing for the interior walls on the top floor. You used to be able to see through to the back windows from the stairs, and walk through all the walls but alas, no more!


Friday: Oh my gosh!(Okay, maybe I said something else...) Today they not only delivered all the blueboard and plaster but they put it up in half of the 2nd floor. This front bedroom is completely finished, as is most of the bathroom.

A view from the outside corner of the same room. The closet/stage is almost ready to go.

The drywallers have left their jar of peanut butter, jar of jelly and loaf of bread upstairs, so I know they'll be back soon.

- A

Tuesday, March 29, 2011

The Ups and Downs, and a Bit in the Middle

We've focused a lot on the stairs. Mostly because they originally started in Anthony's mind, and his mind didn't come complete with nit-picky details like how to support them. But now that they're actually in the house, the rest of us get to see his vision and how much they do open up and let light into the small space we have.

That being said, a new question opened up for me this week. Up until now you could stand on the top floor and look up all the way down into the basement and vice versa.

The vice versa...the view of up the middle of the stairwell from the basement floor. The wall of the bedroom #2 closet and the strapping and collar ties of the attic are visible in the middle of the picture.

We had always thought that we would close off a little area on the main floor and create a little nook that goes out over the hole in the middle and adds a teeny bit more of floorspace. We also thought this would help as a minor sound barrier between the main floor and the basement. We met with "the John" on Saturday and discussed how we would do the railing and by Monday afternoon the floor of the new little area was in.

A and N stand in the new 'nook' while Z is still getting used to navigating stairs without risers.

Now I'm not so sure about it. The light still gets into the basement just fine, but that tiny little extra floor feels like it juts out strangely or breaks the flow or closes the basement off or something. The latter could be a good thing, I don't know. I'm sure I'm going to have the same closed-up feeling when they start putting up actual walls between the rooms.

Below the new nook: the stairs in the basement, along with the office and office windows. Note that it still has plenty of natural light.

So the waffler in me is waffling, but for now I'm not going to do anything. We'll try it out for a while and see how it feels.

Long rays of sunlight, marking the end of the day, creep in from the pond-side windows and almost touch the front door. The 'nook' in question, now visible between the stairs, either brings the floor space that much closer to the stairs, or clogs up the whole view. Also visible in this photo is one of the infamous switch boxes for the stairway.

Thoughts?
- J


Tuesday, March 22, 2011

Show and Tell and a Little Rant

A gratuitous house picture and then let's start with the rant.

The siding was 'pre-primed' in grey. We haven't actually decided on the exterior color yet.

Yesterday I went over to the house to check out what has been happening. While touring the upstairs quarters I noticed a bath fixtures box. Having spent a whole day picking out something I thought I could live with (in terms of style, functionality, and price), I was excited to finally see our fixture installed. But as I opened the box I realized that this was not the one I'd chosen... Although Anthony wasn't with me at that moment, I know he can envision what my face must have looked like: a combination of bewilderment and disbelief that morphed into - dare I say - rage (a similar thing happened when we cut into our wedding cake).

It seems that we're suffering from a growing trend of the people we are paying suggesting alternative 'arrangements' for sinks, toilets, walls and doors that don't take the whole house (or budget) into account, coming up with their own solution without telling us if there is an ambiguity in the plans, or simply ignoring the plans (and not telling us). Dealing with fixture selection and sourcing has been especially difficult. We've continuously been told to pick stuff out as soon as possible (as we're on a schedule) but then told that our selection was either not 'good', or that they have access to a "better" one for some unknown $. Look, I would love to have recommendations and suggestions as long as we can have final approval.

Anyway, after taking some time to cool off, we contacted "the John" via email (it was quite late by then) and asked that he ensure the correct one be installed. In today's trip next door we noticed the offending fixture box had been removed, so hopefully all has been restored. After fighting for these, now I just hope I'm actually happy with them once we're actually living with them.

Despite all that, there are some exciting things happening. An insulation guy was hard at work today putting up the attic vents in preparation for putting in insulation.

Anthony excitedly points out the day's work while Natalie appears bored.

More metal is showing up. Some of it is to make sure the stairs stay where they're supposed to and some of it is to make sure the house stays where it's supposed to.

Metal strapping, complete with way too many nails, connects the landing to the floor joist above allowing the open space and light of the living area (where the picture was taken from) to flow all the way down into the basement

Giant, 50-bolt straps from **** and...
7 foot long threaded rods tie the main floor decking and main floor walls down to the foundation. Again, we'd not going to dare a tropical storm, but...

In addition, the electrical, plumbing, and gas tie-ins (outside the house) continue to be planned for and put in. These have brought up some odd compromises. Since the boiler vent has to be more than 4 feet away from the gas meter, which has to be more than 4 to 5 feet away from the electric meter, which has to more than 6-7 feet above the water line, not all of these can fit on the right front corner of the house (where the wall is ~10 feet long) as we'd prefer. At least one has to be placed on the opposite (south) side and come across the house inside. So much for saving money by placing all the inside utilities close together...

- J