Tuesday, November 27, 2012

Front Door Revisited

Obviously this little house project was a pretty big deal for us. I am blown away on a daily basis that we actually did it. Each piece of it holds a memory of something that went right or something that...

But wait- back to the positive- I marvel at the fact that, as I type this, it's 39 degrees outside, yet I am barefoot in my house and my toesies are toasty. I don't fear stepping out of bed in the morning, because I am now greeted with w-a-r-m-t-h. Yes, the floors are a big positive, and I am so thankful to Anthony (and our other floor elves- ahem, mom and dad) for doing that for me.

Part of the deal was that this house was and is our gift to each other for the next _ _ years forever. My interpretation of this means that on special occasions I can up my nagging and get something checked off the in-the-back-of-my-mind to do list. My birthday this year brought the doorknobs from the front door of the shack into our bathroom.

"Need help, Daddy?"
Place to hang my towel? Check.

See? I knew I saved them for a reason!
- J

Saturday, October 8, 2011

Tortoise-Like Progression

Our remaining house projects (inside and out) are coming along slow and steady now, and after the pace of last year, that's fine by me. We live here now and that's just like a big sigh...ahhhhhh!

The outside retaining wall was completed, grass is now growing, and mulch was laid down on our northern slope.


Hopefully all this will hold our little spot of the planet in place. We're now searching for a more permanent fence and gate so that Zippy can regain his private reign over the backyard.

More coats of paint, window treatments, mirrors, shelves, hooks, furniture... you name it- we're doing it inside the house. But in our own way, which of course means finding things we can reuse as well as family labor practices.

Here are just a few of my favorite recent projects:

Jamey adds his genius design and carpentry skills to our bathroom mirror (also from the floorboards of our old house).

Sadly, Jamey had to leave before the mirror was completed and so it took a couple more weeks for Anthony to finish it.
Add in my bucket-handle-for-a-towel-holder and we're now calling this bathroom done.

My dad spent some time picking out and arranging just the right NY apple branches for us to hang our coats on.

We've learned over the past several years that the secret to living in small spaces with a lot of fun gear is organization.
Our basement project is just beginning.

The porch swing was given to us by our neighbor.
We painted it and restrung the rope. Natalie enjoys her choice of rocking devices.

Just like with anything, there's always something else that can be done, but at this time nothing feels as necessary, and so we're moving along at our new improved (slower) pace.
-J








Saturday, July 2, 2011

Homeless, again

Once again, we have found ourselves pseudo-homeless. This seems to happen to us a lot when planning to move. The timing just never quite lines up exactly. Of course, this time we get to be "between homes" with a very active 11 month-old and an over-anxious dog. In the past, it always worked out...eventually, so I have faith that this one will too.

This time we had to be out of our rental by the end of June, so throughout the week, before and after work each day, we incrementally moved all of our belongings into the bedrooms of our own house - the parts the were fully complete. July 1st rolled around and our house was not finished and livable, so we headed to New York to visit the fam for a while and hopefully give the workers a bit more time to pull it all together.

The risky part about this is that without us there checking up on daily progress (ahem, micromanaging... and yes, we feel it helps), things just might not happen. Or, of course, they might happen, but in a not-the-way-we-intended way.

So what has happened and what remains? The stair guy has been working at pace that Anthony politely describes as 'quite un-feverish' for the past few weeks to complete was has become (according to the stair guy) a very unique set of steps. This has resulted in piles of debris, saws, tools, compressors, cords, and cups that have covered the entire main floor.

The large amount of tools, saws, etc. required to complete the stair trim.

The side entryway was also done. Of course, in typical construction fashion the decking material we used on the front porch four months ago is now no longer made and was not to be found anywhere so we had to settle for a slightly different product (sigh).

The new side/mudroom entry deck.

The rest of the electrical work was finished. The faucets and tub/shower trim were all connected, and the earlier water leak resolved without much issue.

The glitch that did occur was that the wrong bath/shower trim was still installed, despite our efforts back in March to correct our trim order from an earlier mistake! We're beginning to wonder if they're just trying to wear us down. While I realize this is a minor issue in the grand scheme of things, as we'd been here before with the builder, it made it all the more frustrating to have to ask once again to have the mistake fixed.

Towards the end of the week, the stair guy(s) finally wrapped up their work and cleaned up their mess, leaving a nice clean set of stairs and clear floor. It was great to see the 'almost' finished product.


The stairs to the basement, finally!

View of the stairs and kitchen from the living-room area.
We realized our refrigerator is pretty small. Plenty of room to grow...

Natalie enjoying the clean, clear main floor for the first time.

So, now we're ready for the floor guy to come back and finish up the connecting areas. All the doorknobs are in the house ready to be installed. Some trim work needs to be finished and a few things, like some uneven dry wall work in the upstairs bathroom, need to be fixed.

The big hold-up however seems to be that the plumber cannot get the boiler to work. The current plan is to have the company rep. come out on Wednesday to take a look at it. Hopefully then we can check that off.

The boiler, mixing valve, and indirect water heater complex, currently at rest as the boiler will not start. Who really needs hot water?

-J



Sunday, June 26, 2011

The Good, the Bad, and the Crapper

Evidence of the plumber's work on Friday

A trip to the house on Friday revealed water in the toilets. Pretty exciting, I know. However, Friday night also revealed water coming through the kitchen ceiling (bathtub above). Not so joyous. We marked the spot and it doesn't seem to be spreading, so we hope it's not anything serious. I did stop packing things in the nearby cabinets in case they have to come down to fix the issue.

Stairs to basement- shelf along back wall finished

Other evidence of work showed that Rob and co. also worked on the stairs, balusters, railings, and the trim around the stairs, and John sealed part of the floor during the day. John was also over Saturday morning setting the footings for the side entryway. Plenty of happenings, but I kept feeling like it was all things that should've been happening last week, or perhaps Thursday at the very least.

No more worries about falling off the upstairs landing

side entry footings

I have to say, my master carpenter, Anthony, has been doing stellar work in the middle of the night. He cut a beautiful hole for our new sink and secured all the counter tops. I think he likes the fact that the new sink has such right angles- easier to cut the top for it!

Kitchen sink in and ready for the plumber

We've also started moving things over as much as possible. As I previously mentioned, we have to move out of our rental by the end of the month. We may not be ready, but at least our stuff can live in the new house in the rooms that are done (like the upstairs bedrooms).

Anthony and Kevin moving our stuff.
Kevin is a major trooper to help us move out in December and then back in again now.
He even brought his own beer this time.

After moving the washer/dryer out in December, Anthony and Kevin decided it was pretty heavy and called in a third helper, Dave.

It's a little extra work on both ends with this move because we have to be careful to keep our stuff at the new house out of the way of any workers, we have to restore the rental house to its exact previous glory, and we have to keep out a set of items for us to live off of wherever we end up until we can really move in. Fortunately this will be our final move!

Kevin has his own dolly.
I think that pretty much pegs you to help people move.
We're very grateful for this.
-J

Monday, June 20, 2011

Will Work for Lobstah

Too busy to blog these days, but at least that means that things are getting done. The stairs are being formed before our very eyes, and so far they look great. We're still in the town's work order queue to switch out our water valve, but we hear Wednesday could be our lucky day. The concrete basement floor staining and sealing is still a bit of a question mark, but we're hopeful that will be resolved this week as well. We're thinking Sandlot Gray for a color, but more importantly we're hoping it'll happen quickly.

Stairs being formed- note the picture printed out and taped up as a guide.

There are some tall places to paint in our house. Good thing Anthony is tall.

We brought in our personal labor force again this week. My parents arrived on Tuesday and the only times I've seen them put down their paintbrushes so far were to help me with school tasks (grading papers and packing up my classroom) and for Natalie's baptism and our Father's Day dinner. Anthony and the two of them have been working non-stop painting the walls, trim and interior doors.

My mom finishing painting the kitchen.

My dad: painting doors is back-breaking work.

The paint decision has been a bit scary, which it shouldn't be since it's probably the easiest thing in our house that we can change. I've been collecting and staring at paint chips for months now, and finally had to commit. Of course, just when you've made a decision someone (like the paint store guy, Ken) has to step in and tell you their dissenting opinion, like that your yellow is too bright. So far I'm really happy with most of the colors. However, I did end up back at the paint store on Saturday to let Ken know that he was right about my yellow and could he please help me lighten it? (He tried his best.) All in all though the paint is making the place feel more put-together.

Natalie in her first-try yellow room.

Anthony's family came in on Friday and his dad joined in the fun on Saturday while Mali, Jeanie, Natalie and I drove up to Ikea to pick up the final piece of countertop, which Anthony and my dad then cut and placed on Sunday.

Anthony's dad filling in nail holes. For the record I did offer him knee pads.
Full speed ahead!
-J

Saturday, June 11, 2011

Who's Choreographing this Dance Anyway?

I was on the T last year when it was stopped for quite a while underground. I kept thinking I should've just gotten off at the last stop and walked a little farther (you gotta love hindsight- the only time I can claim perfect vision). The frustrating part was that I was in the front car and I could see the light at the end of the tunnel, but I couldn't do anything about the delay to help us get moving and on our way. Such are our feelings about our house right now. There are little things that are happening, but then there are things that we want to happen that aren't. We just need to get all our ducks in a row.

We'll start with the bright side for a run-down of the latest...
The view came into greater focus when the plastic came off the windows and the screens were put on.

Master Bedroom

The plumber has been in hooking up a jumble of pipes in the basement. I think Anthony's glad his part of the plumbing is over.


Stair parts are finally in and scheduled for the middle of this week. We've been told that part will go quickly, but we were told that about the trim which took FOR EV ER.

We've spent our time doing what we can to get things done. My favorite Anthony-project was crafting a stand for our vessel sink and faucet for the "Kamp bathroom". (Yes, if you give us things for our house we will name a room after you too.) I absolutely love how it turned out. The top is actually the old floorboards from the basement of the house we tore down.

View of mudroom entrance and "Kamp bathroom" with homemade vanity.

Our GE (plug for Jason) range and microwave arrived for the kitchen and Anthony is finishing the cabinet trim and toe kicks and getting things ready so that they can be installed. Apparently this will involve changing the plug on the microwave so it can go into Massachusetts' fancy outlets.

There is still one piece of missing temporary countertop. Remember about two weeks ago when I said the missing piece would be in stock in a week? Yeah, that didn't happen, and like a comedy show we have been running ourselves mad trying to figure out a temporary solution for our temporary top. We were set to go check out a craigslist option tomorrow when Ikea called and CONFIRMED (whatever that means) that it would definitely be in by next weekend. So we're taking our chances and waiting it out again. Which holds up the sink/faucet... But that's okay because it's already held up by the water issue.

Ahh, the water issue. The town won't let us have water until they change a valve. Apparently we're in the "queue" for this. I wonder when that will happen. Therefore we have toilets both in our dining room and our shed waiting to be installed as well.

Dining room with toilet parts and stair parts

It's okay, we can't really put the one in the shed in yet since the basement floor has not been etched or sealed yet anyway. That's why the vanity and washer/dryer for that bathroom are still in the rental house.

I'd be lying if I said we weren't getting anxious.
-J

Monday, May 30, 2011

The Night Job

Oceanographer by day, amateur homebuilder by night, and enough grace and stamina leftover to take a time-out and care for Natalie when she pulls her first fever (no worries- she's better now). The glow next door reflects the many nights spent working next door (and highlights the need for shades/curtains).


Sometime in the middle of the night

On Thursday most of our light fixtures were installed by the electricians. Apparently we had lost count of how many lights we actually had, as we ended up being short three fixtures...the master bedroom closet, the washer/dryer area, and the mudroom (after all the problems it's caused us, we just forgot all about it). A few others, like the ones over the island, were deferred until the island was actually secured in place with a countertop. Still, it was fun to see some of the rooms take shape with the trim work nearly complete and the lights up...some of the lights even have temporary bulbs.


Anthony and Natalie checking out the sconce in the bathroom.

We are striving for a Energy Star HERS rating that will require at least 80% of the lights to be something other than incandescent. As most electricians and 'lighting experts' abhor CF or similar energy efficient bulbs because of their un-incandescentness, most of our bulbs will be supplied by a energy rating company (the same people who will pressure test our whole house), and are yet to come in. So the electricians left a skeleton crew of bulbs in place, perhaps to show us that they all actually worked. Again, much of the house, really just the simple rooms, feels like it is almost there...and just waiting for the floor.

These little button lights are our go-to easy fix for many areas of the house.

Which brings me to the rest of the weekend - after another trip to our Swedish hardware/furniture/solution store - we came home with the three remaining lights as well as our temporary solution to a kitchen countertop. Sunday, Anthony finished putting together and securing the cabinets and placed the temporary countertop. There is still one piece of the temporary top that we'll have to pick up, but it was on back order until this coming week. We're using temporary tops in the kitchen and bathrooms so that we can complete the project enough to move in and then focus on making the real ones at our leisure.


Island with butcher block top

We also finalized our door hardware on Friday, which took a dramatic switcheroo right at the end. Many of our selection 'issues' seem to occur when we have some entrenched design preference or idea or concept fixed in our heads that, over time, becomes untenable. Of course once you've decided to go a certain direction, it takes so much longer and so much more effort to change to a direction you'd previously discounted for some, previously iron-clad reason. (Perhaps this is what our builder was going through with our stairs). We were originally heading in one direction with cool handlesets and deadbolts and fancy rectangular rosettes from Emtek, when it occurred to us we wouldn't be able to leave and lock our doors without a key (which in hindsight, everyone should be able to do). After a too-long struggle to find a workable option with Emtek, we ended up changing lock and lever style as well as manufacturers completely. Writing this, it sounds like trivial issue, which I totally agree with, but for 'frugal wafflers' this is a bad scene.

Finally, it's felt like we've been hemorrhaging monopoly money for the past few months, but we think we now have everything ordered, planned out, or waiting to be installed. Everything, that is, except the kitchen sink. We'll have to get on that.
-J

Saturday, May 28, 2011

Something Under Our Feet

Our tile is in and finished: the mudroom floor, the wall around the tub, and the bathroom floor.

Mudroom tile- It's called "Ayers Rock Cobalto Blue", which I find funny. I've been to Ayers Rock (yes, I did just work that in) and nothing about it reminds me of this tile, nor do I think that the tile or Ayers Rock have much to do with "blue". Maybe that's why we got a sweet discount on it.

Upstairs bathroom: "Stoney Point Grigio" on the floor and white subway tile around the tub.

The floor in the rest of the house was scheduled to be installed Monday, but now that's pushed back until Wednesday. Why? It's complicated. It involves stair guys, floor guys, us, "experts" on the phone in Georgia and the whole-like. What it comes down to is that our people here have been doing things a certain way for thirty years and if we throw them even the smallest design curve ball they balk and spend their time and energy trying to get us to change our minds rather than spending their time and energy embracing the new challenge (even if we're trying to get them to do something that's actually pictured in their own catalog). You would also think stair guys and floor guys had worked with each other before. This does not seem to be the case. This is difficult for Anthony and I to deal with, and I think it's because we both work in professions where learning something new (and collaborating) is celebrated.

So I'm holding my breath until Wednesday now.
-J

Friday, April 8, 2011

Daily Reflections

I feel like every time I visit the house I stand in awe of the day's accomplishments. Sometimes big, sometimes small, these raw changes transform the space into something that I either never really thought I'd actually see (which often results in a "Jodes, you won't believe what...") or that I didn't expect to see (which often results in a "John, I'm confused why...").

This past week and a half has garnered many of each type of response:


Saturday/Sunday: This is the basement window along the south side of the house. Insulating the basement became a bit more involved toward the back of the house. 3" of rigid foam exists behind and between the 2x3 studs where they back up to the concrete foundation. Above this, cellulose was blown in behind a mess into the 2x6 studs of the outside wall. Remember that there is an inch of rigid foam on the exterior of the above-ground sections well.


Monday: You are looking at the ceiling of the main floor. 6" of fiberglass provides sound-proofing between levels. The insulated supply lines for the upper zone of radiant heating is visible as well.

Tuesday: As quality insulation was a big part of our hopes for the house, we've tried to use blown-in cellulose where ever possible on the exterior walls. It works better per unit R value than fiberglass (it's all about the installation). This caused some communication issues when something else was placed there instead. The area along the outer wall where the floor joists are supported was one of those places. However after talking with John, he had the sub pull it out and pour foam instead (shown here in the yellow color).

By now most of the cellulose has been put in the master bedroom outer wall, up to the ceiling, dampening out most of the noise.


Another look at one of the forward bedrooms and upstairs bathroom with insulation.


Wednesday: The main level is now quiet as a tomb. Although I suspect that it will not stop Jody from tap dancing again.

Thursday: More sound proofing for the interior walls on the top floor. You used to be able to see through to the back windows from the stairs, and walk through all the walls but alas, no more!


Friday: Oh my gosh!(Okay, maybe I said something else...) Today they not only delivered all the blueboard and plaster but they put it up in half of the 2nd floor. This front bedroom is completely finished, as is most of the bathroom.

A view from the outside corner of the same room. The closet/stage is almost ready to go.

The drywallers have left their jar of peanut butter, jar of jelly and loaf of bread upstairs, so I know they'll be back soon.